This was around 400m2 of ‘Evening Rose’, supplied with thanks from The Resin Mill Ltd.
We completed this job from start to finish, starting with the removal of the existing drive, approx 200 tonnes, installing a hardcore sub-base and a laying base of open-textured tarmac, making this drive fully permeable….
We also added the block-paved drive apron…